Create a Work Breakdown Structure
Need help with this assignment?Get an original answer from a qualified tutor — from $10/page.
Get it written →Order Instructions
Week 7 Activity – Create a Work Breakdown Structure
This activity is designed to help you prepare for the assignment due next week, Analysis of Direct and Indirect Costs.
You will use the provided template to create a Work Breakdown Structure (WBS) sheet using the project information from the Week 8 assignment. It includes a place for both direct and indirect costs for the following items:
Labor.
Manufacturing.
Research and Development.
General Administrative.
This activity is designed to help you better understand the difference between direct and indirect costs. For example, your direct labor costs may be the crew that needs to install solar panels, but indirect labor costs would be any sort of maintenance work required to clean up after the installation.
Please note: The sum formulas are pre-populated in the Total row, so make sure that as you edit, you keep those formulas properly updated. For example, rows should only be inserted above the Total row.
For help with basic Excel, please review the following:
Excel Help page.
Exploring, data entry, editing, and autofill.
Using Undo and Redo.
Save/Save As.
Adjusting row heights and column widths.
Rows and columns: Insert, delete, hide, and unhide.
WBS Template [XLSX].
Note: The provided template has a space for each category and formulas to calculate your total expenses. If you need to add more items than the provided three spaces in each category, just add a row below the last row in the category (above the row that calculates the total). Continue adding rows as needed.
Get a plagiarism-free answer to this question
Send us your instructions and we’ll match you with the best writer in your subject.
- 100% human-written, zero AI
- Turnitin report included
- Confidential — we never share your data
- Free revisions & refunds
