College Pal
Connecting to a pal for your paper
  • Home
  • Place Order
  • My Account
    • Register
    • Login
  • Confidentiality Policy
  • Samples
  • How It Works
  • Guarantees

Sms or Whatsapp only : US:+12403895520

 

email: [email protected]
April 1, 2024

Open the Reactors Operating File (xls) Download Reactors Operating File (xls)in Tableau.? Drag the Operating Rx-data.gov sheet into the data connection canvas. Run interpr

Finance Management

  1. Open the Reactors Operating File (xls) Download Reactors Operating File (xls)in Tableau. 
  2. Drag the Operating Rx-data.gov sheet into the data connection canvas.
  3. Run interpreter. 
  4. Review the Excel file that Tableau generated.
    • Question 1: Note the changes that the interpreter made. 
      1.  What data (if any) did the interpreter ignore?
      2. What data were interpreted as column headers?
      3. How many rows did the interpreter remove?
  5. Select “2018 capacity factor” through “2003 capacity factor” columns and pivot. 
    • Question 2: How many rows does your dataset contain after pivoting?  (Note that Tableau displays a maximum of 1000 rows.  You can increase the maximum number by clicking the box containing “1,000” and increasing the number). 
    • Question 3: Is this dataset ready for analysis?  Would you make any other changes? Explain.
  6. Split the “Pivot Field Names” column (right-click on the column and select split in the dropdown)
    • Question 4: Are all fields (or columns) named appropriately?  If not, what fields need to be renamed?
  7. Rename fields that need to be renamed.
    • Question 5: Are all data types correct?  For example, are date fields showing the date icon? Are there any fields that seem numeric but refer to categories?  List incorrect data types.
  8. Correct the data types (click on the icon and select the appropriate type from the drop-down menu)
    • Question 6: Which column contains a calculated field (hint: look for a = in front of the data type icon)?  Why is this column a calculated field?
  9. Click on Sheet 1.  Drag the capacity factor field (the field that was created in the pivot step) to rows.  Notice that the field is aggregated as a sum. Change the sum aggregation to average by right-clicking on the field selecting measure and then average.
  10. Drag the date field corresponding to the year that the capacity factor was measured to the column's shelf. Note the result. (Hint: examine the x-axis.)
  11. Drag reactor and containment type to color.
  12. Change the date field to continuous (right-click on the field and select continuous). Note how the graph changes. (Hint: examine the x-axis).
    • Question 7:  How did the graph change when you changed the date field to continuous?  Why is it better to use the continuous field?

You should 1) submit your Tableau workbook (.twbx) here, along with 2) a screenshot of your finished workbook, 

  • attachment

    January-reactors-operating.xlsx

Operating Rx- data.gov

<

Collepals.com Plagiarism Free Papers

Are you looking for custom essay writing service or even dissertation writing services? Just request for our write my paper service, and we'll match you with the best essay writer in your subject! With an exceptional team of professional academic experts in a wide range of subjects, we can guarantee you an unrivaled quality of custom-written papers.

Get ZERO PLAGIARISM, HUMAN WRITTEN ESSAYS

Why Hire Collepals.com writers to do your paper?

Quality- We are experienced and have access to ample research materials.

We write plagiarism Free Content

Confidential- We never share or sell your personal information to third parties.

Support-Chat with us today! We are always waiting to answer all your questions.

Making simplistic judgments can be harmful to stakeholders. Many organizations have implicit bias training programs. But often, these programs are not very effective. In your Part 1: Research and Review? Review the following Gestalt principles and discuss them: Proximity Similarity Closure Continuity Figure-Gro

Related Posts

Finance Management

Anyone interested in a career related to Business and Finance, or who is interested in these subjects for personal reasons, will greatly benefit from read

Finance Management

Wesley Family Health Center (WFHC) is a community-centered primary care facility providing comprehensive, patient-centered healthcare services to patients

Finance Management

This assignment will be a 10-12 page read on how Artificial Intelligence (AI) is revolutionizing industries by enabling new ways of thinking, operating, a

Why Choose Us

Best Essay Writing Services- Get Quality Homework Essay Paper at Discounted Prices

At the risk of sounding immodest, we must point out that we have an elite team of writers. Ours isn’t a collection of individuals who are good at searching for information on the Internet and then conveniently re-writing the information obtained to barely beat Plagiarism Software. Who can’t do that?

Our writers have strong academic backgrounds with regards to their areas of writing. A paper on History will only be handled by a writer who is trained in that field. A paper on health care can only be dealt with by a writer qualified on matters health care. Thesis papers will only be handled by Masters’ Degree holders while Dissertations will strictly be handled by PhD holders. With such a system, you needn’t worry about the quality of work. Quality isn’t just an option, it is the only option. We don’t just employ writers, we hire professionals.

We have writers spread into all fields including but not limited to Philosophy, Economics, Business, Medicine, Nursing, Education, Technology, Tourism and Travels, Leadership, History, Poverty, Marketing, Climate Change, Social Justice, Chemistry, Mathematics, Literature, Accounting and Political Science.

Our writers are also well trained to follow client instructions as well adhere to various writing conventional writing structures as per the demand of specific articles.

They are also well versed with citation styles such as APA, MLA, Chicago, Harvard, and Oxford which come handy during the preparation of academic papers.

They also have unrivalled skill in writing language be it UK English or USA English considering that they are native English speakers. You also needn’t worry about logical flow of thought, sentence structure as well as proper use of phrases.

Our writers are also not the kind to decorate articles with unnecessary filler words. We respect your money and most importantly your trust in us. In writing, we will be precise and to the point and fill the paper with content as opposed to words aimed at beating the word count.

Our shift-system also ensures that you get fresh writers each time you send a job. This helps overcome occupational hazards brought about by fatigue. Hence, quality will consistently be at the top.

From our writers, you expect; good quality work, friendly service, timely deliveries, and adherence to client’s demands and specifications.

Once you’ve submitted your writing requests, you can go take a stroll while waiting for our all-star team of writers and editors to submit top quality work.

How Our Website Works

Get an Essay from Us

College Essays is the biggest affiliate and testbank for WriteDen. We hire writers from all over the world with an aim to give the best essays to our clients.

Our writers will help you write all your homework. They will write your papers from scratch. We also have a team of editors who read each paper from our writers just to make sure all papers are of HIGH QUALITY & PLAGIARISM FREE.

Step 1
To make an Order you only need to click ORDER NOW and we will direct you to our Order Page. Then fill Our Order Form with all your assignment instructions. Select your deadline and pay for your paper. You will get it few hours before your set deadline. Deadline range from 6 hours to 30 days.

Step 2
Once done with writing your paper we will upload it to your account on our website and also forward a copy to your email.

Step 3
Upon receiving your paper, review it and if any changes are needed contact us immediately. We offer unlimited revisions at no extra cost.

Is it Safe to use our services?
We never resell papers on this site. Meaning after your purchase you will get an original copy of your assignment and you have all the rights to use the paper.

Pricing and Discounts
Our price ranges from $8-$14 per page. If you are short of Budget, contact our Live Support for a Discount Code. All new clients are eligible for 20% off in their first Order. Our payment method is safe and secure.
Please note we do not have prewritten answers. We need some time to prepare a perfect essay for you.

Recent Posts

  • You are part of an association that wants to increase the number of women CEOs.? Research the overall impact of women CEOs in business? Research the overall
  • Annotated Bibliography Assignment
  • Name and discuss four prevention essential health benefits for women
  • United States Preventive Service Taskforce (USPSTF)
  • Assignment 3 Program Intervention
College Pal

All Rights Reserved Terms and Conditions
College pals.com Privacy Policy 2010-2018

US_Commercial Nuclear Power Reactors – Operating Reactors
Plant Name, Unit Number NRC Reactor Unit Web Page Docket Number License Number Location NRC Region Licensee Parent Company Utility Name Parent Company Website Parent Company Notes Reactor and Containment Type Nuclear Steam System Supplier and Design Type Architect-Engineer Constructor Construction Permit Issued Operating License Issued Commercial Operation Renewed Operating License Issued Operating License Expires Licensed MWt Note 2018 Capacity Factor (Percent) 2017 Capacity Factor (Percent) 2016 Capacity Factor (Percent) 2015 Capacity Factor (Percent) 2014 Capacity Factor (Percent) 2013 Capacity Factor (Percent) 2012 Capacity Factor (Percent) 2011 Capacity Factor (Percent) 2010 Capacity Factor (Percent) 2009 Capacity Factor (Percent) 2008 Capacity Factor (Percent) 2005 Capacity Factor (Percent) 2004 Capacity Factor (Percent) 2003 Capacity Factor (Percent) Years of Operation through 12/31/2019
Arkansas Nuclear One, Unit 1 ANO 1 05000313 DPR-51 London, AR (6 MI WNW of Russellville,  AR) 4 Entergy Operations, Inc. Entergy Nuclear Operations, Inc. www.entergy-nuclear.com PWR-DRYAMB B&W LLP BECH BECH 12/6/68 5/21/74 12/19/74 6/20/01 5/20/34 2568 76% 87% 72% 82% 98% 56% 102% 87% 90% 99% 83% 78% 92% 92% 45
Arkansas Nuclear One, Unit 2 ANO 2 05000368 NPF-6 London, AR (6 MI WNW of Russellville,  AR) 4 Entergy Operations, Inc. Entergy Nuclear Operations, Inc. www.entergy-nuclear.com PWR-DRYAMB CE BECH BECH 12/6/72 9/1/78 3/26/80 6/30/05 7/17/38 3026 82% 70% 94% 89% 85% 91% 93% 90% 97% 90% 91% 91% 99% 90% 41
Beaver Valley Power Station, Unit 1 Beaver Valley 1 05000334 DPR-66 Shippingport, PA(17 MI W of McCandless,  PA) 1 FirstEnergy Nuclear Operating Co. FirstEnergy Nuclear Operating Company www.firstenergycorp.com PWR-DRYAMB WEST 3LP S&W S&W 6/26/70 7/2/76 10/1/76 11/5/09 1/29/36 2900 92% 99% 91% 90% 86% 86% 92% 101% 91% 92% 101% 101% 93% 83% 43
Beaver Valley Power Station, Unit 2 Beaver Valley 2 05000412 NPF-73 Shippingport, PA (17 MI W of McCandless,  PA) 1 FirstEnergy Nuclear Operating Co. FirstEnergy Nuclear Operating Company www.firstenergycorp.com PWR-DRYAMB WEST 3LP S&W S&W 5/3/74 8/14/87 11/17/87 11/5/09 5/27/47 2900 90% 90% 97% 90% 98% 97% 91% 102% 84% 87% 103% 93% 100% 91% 32
Braidwood Station, Unit 1 Braidwood 1 05000456 NPF-72 Braceville, IL (20 MI SSW of Joliet,  IL) 3 Exelon Generation Co., LLC Exelon Corporation, LLC www.exeloncorp.com PWR-DRYAMB WEST 4LP S&L CWE 12/31/75 7/2/87 7/29/88 1/27/16 10/17/46 3645 93% 98% 90% 93% 103% 95% 91% 101% 89% 95% 101% 100% 95% 97% 32
Braidwood Station, Unit 2 Braidwood 2 05000457 NPF-77 Braceville, IL (20 MI SSW of Joliet,  IL) 3 Exelon Generation Co., LLC Exelon Corporation, LLC www.exeloncorp.com PWR-DRYAMB WEST 4LP S&L CWE 12/31/75 5/20/88 10/17/88 1/27/16 12/18/47 3645 92% 88% 95% 91% 96% 98% 93% 93% 99% 93% 92% 94% 101% 96% 31
Browns Ferry Nuclear Plant, Unit 1 Browns Ferry 1 05000259 DPR-33 Limestone County, AL (10 miles south of Athens, AL and 32 MI W of Huntsville,  AL) 2 Tennessee Valley Authority Tennessee Valley Authority www.tva.gov BWR-MARK 1 GE 4 TVA TVA 5/10/67 12/20/73 8/1/74 5/4/06 12/20/33 3952 82% 97% 83% 94% 90% 94% 88% 91% 86% 94% 88% 46
Browns Ferry Nuclear Plant, Unit 2 Browns Ferry 2 05000260 DPR-52 Limestone County, AL (10 miles south of Athens, AL and 32 MI W of Huntsville,  AL) 2 Tennessee Valley Authority Tennessee Valley Authority www.tva.gov BWR-MARK 1 GE 4 TVA TVA 5/10/67 6/28/74 3/1/75 5/4/06 6/28/34 3952 97% 83% 94% 85% 98% 79% 99% 80% 91% 94% 98% 90% 100% 86% 45
Browns Ferry Nuclear Plant, Unit 3 Browns Ferry 3 05000296 DPR-68 Limestone County, AL (10 miles south of Athens, AL and 32 MI W of Huntsville,  AL) 2 Tennessee Valley Authority Tennessee Valley Authority www.tva.gov BWR-MARK 1 GE 4 TVA TVA 7/31/68 7/2/76 3/1/77 5/4/06 7/2/36 3952 76% 93% 80% 92% 88% 89% 83% 87% 81% 95% 81% 94% 89% 96% 43
Brunswick Steam Electric Plant, Unit 1 Brunswick 1 05000325 DPR-71 Southport, NC (20 MI S of Wilmington, NC) 2 Duke Energy Progress, LLC Duke Energy www.duke-energy.com BWR-MARK 1 GE 4 UE&C BRRT 2/7/70 9/8/76 3/18/77 6/26/06 9/8/36 2923 85% 93% 83% 93% 89% 92% 77% 100% 83% 98% 85% 94% 86% 101% 43
Brunswick Steam Electric Plant, Unit 2 Brunswick 2 05000324 DPR-62 Southport, NC (20 MI S of Wilmington, NC) 2 Duke Energy Progress, LLC Duke Energy www.duke-energy.com BWR-MARK 1 GE 4 UE&C BRRT 2/7/70 12/27/74 11/3/75 6/26/06 12/27/34 2923 93% 82% 92% 81% 98% 73% 98% 79% 99% 80% 95% 86% 98% 99% 45
Byron Station, Unit 1 Byron 1 05000454 NPF-37 Byron, Il (17 MI SW of Rockford,  IL) 3 Exelon Generation Co., LLC Exelon Corporation, LLC www.exeloncorp.com PWR-DRYAMB WEST 4LP S&L CWE 12/31/75 2/14/85 9/16/85 11/19/15 10/31/44 3645 94% 89% 97% 88% 97% 96% 88% 88% 101% 94% 95% 94% 102% 94% 34
Byron Station, Unit 2 Byron 2 05000455 NPF-66 Byron, Il (17 MI SW of Rockford,  IL) 3 Exelon Generation Co., LLC Exelon Corporation, LLC www.exeloncorp.com PWR-DRYAMB WEST 4LP S&L CWE 12/31/75 1/30/87 8/2/87 11/19/15 11/6/46 3645 100% 89% 86% 94% 94% 86% 94% 93% 96% 102% 96% 96% 96% 101% 32
Callaway Plant Callaway 05000483 NPF-30 Fulton, MO (25 MI ENE of Jefferson City,  MO) 4 Union Electric Co. AmerenUE www.ameren.com Strategic Teaming and Resource Sharing (STARS) group. They share resources for refueling outages and develop some shared licensing applications. PWR-DRYAMB WEST 4LP BECH DANI 4/16/76 10/18/84 12/19/84 3/6/15 10/18/44 3565 100% 77% 87% 96% 89% 77% 103% 90% 86% 98% 90% 77% 78% 97% 35
Calvert Cliffs Nuclear Power Plant, Unit 1 Calvert Cliffs 1 05000317 DPR-53 Lusby, MD (40 MI S of Annapolis,  MD) 1 Calvert Cliffs Nuclear Power Plant, LLC – Owner Exelon Generation Company, LLC – Operator Exelon Corporation, LLC www.exeloncorp.com PWR-DRYAMB CE BECH BECH 7/7/69 7/31/74 5/8/75 3/23/00 7/31/34 2737 92% 97% 89% 97% 91% 97% 81% 101% 90% 98% 93% 100% 92% 102% 45
Calvert Cliffs Nuclear Power Plant, Unit 2 Calvert Cliffs 2 05000318 DPR-69 Lusby, MD (40 MI S of Annapolis,  MD) 1 Calvert Cliffs Nuclear Power Plant, LLC – Owner Exelon Generation Company, LLC – Operator Exelon Corporation, LLC www.exeloncorp.com PWR-DRYAMB CE BECH BECH 7/7/69 8/13/76 4/1/77 3/23/00 8/13/36 2737 100% 91% 95% 86% 100% 81% 101% 92% 97% 93% 99% 94% 100% 82% 43
Catawba Nuclear Station, Unit 1 Catawba 1 05000413 NPF-35 York, SC (18 MI S of Charlotte, NC) 2 Duke Energy Carolinas, LLC Duke Energy www.duke-energy.com PWR-ICECND WEST 4LP DUKE DUKE 8/7/75 1/17/85 6/29/85 12/5/03 12/5/43 3469 93% 90% 97% 88% 86% 96% 89% 89% 100% 91% 89% 93% 98% 83% 34
Catawba Nuclear Station, Unit 2 Catawba 2 05000414 NPF-52 York, SC (18 MI S of Charlotte, NC) 2 Duke Energy Carolinas, LLC Duke Energy www.duke-energy.com PWR-ICECND WEST 4LP DUKE DUKE 8/7/75 5/15/86 8/19/86 12/5/03 12/5/43 3469 91% 96% 88% 86% 100% 86% 92% 101% 92% 90% 103% 102% 89% 94% 33
Clinton Power Station, Unit 1 Clinton 05000461 NPF-62 Clinton, IL (23 MI SSE of Bloomington, IL) 3 Exelon Generation Co., LLC Exelon Corporation, LLC www.exeloncorp.com