Determine required fire resistance requirements for all building components of the project and evaluate if the quantity of exterior windows meets all requirements.
PROJECT PART 2
Fire Resistance Instructions
*Important Revit Link: https://drive.google.com/file/d/1Ge1T3x-hFE5kOFH-b…
SITE ADDRESS: 4055 IRVING ST.
Deliverables:
There are TWO deliverables for this step of the project, and each is set up as a separate Assignment in Canvas – all deliverables must be submitted for a full grade. Grading is explained in the body of each Assignment. Deliverables need to follow the order in the module, each must be submitted before the next one becomes available.
This project is based on your final project deliverable from DSIT 034. We will spend the rest of the semester re-visiting this project and analyzing and when required improving it to make sure it satisfies the applicable codes. You are only required to modify your designs to achieve compliance, but this often offers an opportunity to improve the design so feel free to make other modifications as we progress.
The goal of the assignment is to determine required fire resistance requirements for all building components of the project and evaluate if the quantity of exterior windows meets all requirements.
Requirements:
11×17 sized drawings executed in Revit, printed to color PDF, and uploaded to Canvas. Drawings should include the project name, your full name, class name, and date. This part of the project builds on Part 1 new requirements will be shown IN ADDITION to the last assignment’s requirements. The information should be laid out on TWO 11 x 17 sheets in Landscape orientation and contain:
First Sheet:
1. Floor plans, scaled to fit on a single 11×17 sheet, each occupancy noted in different color using Area Plan command, required fire-resistance assemblies noted using wide lines of distinct colors and patterns, and color legend identifying different occupancies. DO NOT INCLUDE ANY OTHER ANNOTATIONS.
2. A legend explaining what kinds of assemblies different line types identify. The assemblies should be defined by the fire-resistance rating (1 hour, 2 hours, etc.) and by type (fire barrier, fire partition, etc.).
3. Project Information listing project address, type of construction, whether the building is sprinklered, occupancy types and description of occupancy separation (and relevant calculations if applicable), list of incidental uses (if any), allowed, and an actual number of stories, allowed and actual building height, building area calculation, allowed and actual area for each floor and total building area, fire rating schedule based on the type of construction defining the rating of all elements indicated in Table 601.
Second Sheet:
1. Exterior elevations (1-4, depending on your project), scaled to fit on a single 11×17 sheet, the extent of openings clearly visible.
2. The allowable and actual extent of exterior openings expressed as a percentage based on Table 705.8. noted next to each exterior elevation.
Process:
You have been assigned to a team for this class and should collaborate with your teammates to complete the assignment. Please complete the following steps before the final assignment submission:
1. Incorporate feedback from Project Part 1 – Building Size and Occupancy Separation in your drawings.
2. Read Assignment Instructions.
3. Determine the Fire Separation Distance (FSD) for your building based on the provided site plan. If the FSD is greater than 30 feet you only need to note “greater than 30 feet.”
4. Complete work as indicated under “Execution.”
*Note: Hi, I need your help to revised my current/ incorrect/ incomplete work to make them meet the requirements. I have attached some correct example of how the correct deliverables look like. The correct example using a site/ building which is different than mine, however the content can be done in a similar way. I already attached a drive link to download my site revit file.
Requirements: As Required
dsIT 100 – PROJECT PART 2 Fire Resistance Instructions Due Date: See Class Schedule Deliverables: There are TWO deliverables for this step of the project, and each is set up as a separate Assignment in Canvas – all deliverables must be submitted for a full grade. Grading is explained in the body of each Assignment. Deliverables need to follow the order in the module, each must be submitted before the next one becomes available. This project is based on your final project deliverable from DSIT 034. We will spend the rest of the semester re-visiting this project and analyzing and when required improving it to make sure it satisfies the applicable codes. You are only required to modify your designs to achieve compliance, but this often offers an opportunity to improve the design so feel free to make other modifications as we progress. The goal of the assignment is to determine required fire resistance requirements for all building components of the project and evaluate if the quantity of exterior windows meets all requirements. Requirements: 11×17 sized drawings executed in Revit, printed to color PDF, and uploaded to Canvas. Drawings should include the project name, your full name, class name, and date. This part of the project builds on Part 1 new requirements will be shown IN ADDITION to the last assignment’s requirements. The information should be laid out on TWO 11 x 17 sheets in Landscape orientation and contain: First Sheet: 1. Floor plans, scaled to fit on a single 11×17 sheet, each occupancy noted in different color using Area Plan command, required fire-resistance assemblies noted using wide lines of distinct colors and patterns, and color legend identifying different occupancies. DO NOT INCLUDE ANY OTHER ANNOTATIONS. 2. A legend explaining what kinds of assemblies different line types identify. The assemblies should be defined by the fire-resistance rating (1 hour, 2 hours, etc.) and by type (fire barrier, fire partition, etc.). 3. Project Information listing project address, type of construction, whether the building is sprinklered, occupancy types and description of occupancy separation (and relevant calculations if applicable), list of incidental uses (if any), allowed, and an actual number of stories, allowed and actual building height, building area calculation, allowed and actual area for each floor and total building area, fire rating schedule based on the type of construction defining the rating of all elements indicated in Table 601. Second Sheet: 1. Exterior elevations (1-4, depending on your project), scaled to fit on a single 11×17 sheet, the extent of openings clearly visible. 2. The allowable and actual extent of exterior openings expressed as a percentage based on Table 705.8. noted next to each exterior elevation.
Process: You have been assigned to a team for this class and should collaborate with your teammates to complete the assignment. Please complete the following steps before the final assignment submission: 1. Incorporate feedback from Project Part 1 – Building Size and Occupancy Separation in your drawings. 2. Read Assignment Instructions. 3. Determine the Fire Separation Distance (FSD) for your building based on the provided site plan. If the FSD is greater than 30 feet you only need to note “greater than 30 feet.” 4. Complete work as indicated under “Execution.” 5. Review your conclusions with your group. Please discuss: • Did you all come up with the same building information (this should have been updated based on feedback from the last assignment)? • Are you all in agreement on everyone’s fire-resistance rating assemblies and their locations on the plan? • Are you all in agreement with everyone’s percentages of allowable exterior openings and strategy for calculating actual opening sizes? • Are there any questions you still have about the assignment? 6. Correct your work based on group discussion. 7. Post any questions you have to Project Part 2 Q&A. You can also use the discussion to share information with the class, like correct FSD, collaboration is encouraged. 8. Fill out Project Part 2 – Fire Resistance Checklist and submit it under the first assignment submission. You can print the checklist, fill it out by hand and scan it, or fill it out digitally. 9. Correct and complete any items you are still missing and submit for the final grade. All steps must be completed to receive complete points for Project – Part 2.
Execution: 1. Determine fire resistance ratings of building elements based on your type of construction by referring to Table 601. 2. Determine the required fire-resistance rating of exterior nonbearing walls based on Table 705.5. 3. Determine the allowable percentage of exterior openings based on Section 705 and then calculate the actual percentage of the openings you are proposing in your design (area of the opening equals width time height), and note FSD, the allowable amount of openings, and the actual amount of openings at each elevation. 4. Refer to Chapter 7 to determine if your building requires any additional fire resistance or smoke separations, consulting sections 706 thru 713. Note any code sections you might think would be relevant and bring them to your group discussion. 5. Indicate all required assemblies by assembly type and fire-resistance rating using different colored lines on your plan. The industry practice is to use different dash types for different numbers of fire-resistance rating hours, but you can design your indications however you like if the information is clear. Use detail lines and create custom lines in the “Line Styles” which are located in the “Additional Settings” in the Manage Tab in Revit. 6. Create a legend explaining any lines or symbols you are using to identify different assemblies and other items on the plan. The scale of the legend should always match the scale of the drawings. 7. Update the Project Information as noted in the Requirements (format for clarity and legibility). You can format it as a Legend or Drafting View in Revit, but I do not suggest placing the text directly on the sheet since you will need to use it in the future on a different sheet.
Collepals.com Plagiarism Free Papers
Are you looking for custom essay writing service or even dissertation writing services? Just request for our write my paper service, and we'll match you with the best essay writer in your subject! With an exceptional team of professional academic experts in a wide range of subjects, we can guarantee you an unrivaled quality of custom-written papers.
Get ZERO PLAGIARISM, HUMAN WRITTEN ESSAYS
Why Hire Collepals.com writers to do your paper?
Quality- We are experienced and have access to ample research materials.
We write plagiarism Free Content
Confidential- We never share or sell your personal information to third parties.
Support-Chat with us today! We are always waiting to answer all your questions.