Corporations have to select among many projects that are under consideration by the management.
Need help with this assignment?Get an original answer from a qualified tutor — from $10/page.
Get it written →Corporations have to select among many projects that are under consideration by the management. Their
primary instrument for evaluating and selecting among the available projects is the benefit-cost analysis. In
this analysis, both the annual benefits and the annual costs deriving from a project are estimated in several
different categories. Then the total benefit is divided by the total cost to produce a benefit-cost ratio. This
ratio is then used by corporations to compare numerous projects under consideration. A benefit-cost
ratio greater than 1.0 indicates that the benefits are greater than the costs, and the higher a project’s
benefit-cost ratio, the more likely it is to be selected over projects with lower ratios.
Currently, the JET Corporation is evaluating two dam project constructions, one in southwest Georgia
(Dam #1) and the other in North Carolina (Dam #2). The company has identified six areas of benefits:
improved navigation, hydroelectric power, fish and wildlife, recreation, flood control, and the commercial
development of the area. Furthermore, there are three estimates available for each type benefit – a
minimum possible value, a most likely value (i.e., a mode or peak), and a maximum possible value. For the
costs, two categories associated with a construction project of this type have been identified: the total
capital cost, annualized over 30 years (at a rate specified by the creditors and the government), and the
annual operations and maintenance costs. These benefits and costs estimations for both dam projects (in
Get a plagiarism-free answer to this question
Send us your instructions and we’ll match you with the best writer in your subject.
- 100% human-written, zero AI
- Turnitin report included
- Confidential — we never share your data
- Free revisions & refunds