References are not required, however, when references and citations are included, you must apply and use the basic citation s
References are not required, however, when references and citations are included, you must apply and use the basic citation styles of APA. Use in-text citation and list the reference on your supporting source following APA's style and formatting.
Do not copy and paste information or concepts from the Internet and claim it as your work. It will be considered Plagiarism and you will receive zero for your work.
Project Schedule – xxxx |
||||||
WBS |
Task # |
Task Action |
Duration |
Predecessor |
Resource |
|
1.0 |
xxx |
Use the same measure (Min or Hrs.) |
leave duration blank – subordinate tasks identify actual duration leave predecessor blank – no predecessor leave resource blank – put in subordinate tasks |
|||
1.1 |
1 |
Do task 1 |
||||
1.1.1 |
2 |
Do sub-task 1.1 |
x min |
1 |
resource-a, specialist-name |
Use the same measure for all durations(Min or Hrs.) |
1.1.2 |
3 |
Do sub-task 1.2 |
x min |
2 |
etc. |
|
1.1.3 |
4 |
Do sub-task 1.3 |
x min |
3 |
etc. |
|
1.2 |
5 |
Do task |
x min |
2 |
etc. |
|
1.3 |
6 |
Do task |
x min |
etc. |
etc. |
|
1.4 |
7 |
Do task |
x min |
etc. |
etc. |
|
as many tasks as needed |
etc. |
etc. |
||||
1.xx |
xxx completed |
0 min |
This is a milestone with zero duration |
|||
2.0 |
10 |
yyy |
||||
2.1 |
11 |
Do task 11 |
x min |
resource-b, person-2 |
||
2.2 |
12 |
Do task |
x min |
11 |
etc. |
|
2.3 |
13 |
Do task |
x min |
12 |
etc. |
|
2.4 |
14 |
Do task |
x min |
etc. |
etc. |
|
2.5 |
15 |
Do task |
x min |
etc. |
etc. |
|
as many tasks as needed |
etc. |
etc. |
||||
2.xx |
yyy completed |
0 min |
Use the same measure (Min or Hrs.) |
|||
Project Schedule – xxxx |
||||||
WBS |
Task # |
Task Action |
Duration |
Predecessor |
Resource |
|
,
IT Project This project simulates the Analysis and Planning needed to provide IT services for a new building. The student
must submit a Project Schedule based on the Project Requirements and details below.
1. Using the attached MS Word table template, create a project schedule. The project schedule will need
the following columns: WBS; Task #; Task Action; Duration; Predecessor; and Resources.
2. Do not go beyond the scope identified below. The project only covers tasks identified below.
Background: IT has been notified that a new office building is ready for occupancy. All telecommunication
cables are in place. Rooms are equipped to provide access to the network once the network servers are
installed. Wireless routers are installed throughout the building to provide wireless access once the network
servers are installed. VOIP phones and vendor-supplied networked copier are already ordered.
NOTE: note specifications may contain multiple actions/tasks. Break them down into separate rows and group
similar actions into a block of tasks (i.e., Purchase Resources; Setup Equipment; etc.).
Project Specifications:
• Purchase, setup, deploy and test network servers that will be managed in the new building’s IT area.
o Setup includes loading and testing network software at corporate IT before deployment.
o Test network servers in the new building after deployment.
o NOTE: Network servers must be installed and operational before other devices can be tested
for internet and wireless connectivity.
• Purchase, setup, deploy and test Desktop PCs and Laptops in offices, labs and administrative areas.
o Setup includes loading and testing corporate software at corporate IT before deployment.
o Test all systems and ensure they can access the network once deployed.
o Test all wireless systems and ensure they can access the wireless routers.
• Purchase, deploy and test wireless Projectors.
o Test all Projectors to ensure desktops can access them via direct cabling.
o Test all Project to ensure mobile laptops can access them wirelessly.
• Purchase, deploy and test VOIP phones (they use the network to receive/generate phone calls).
o Test all phones to ensure they function properly across the network.
• Test networked Printers/Copiers once they are delivered by the lease vendor.
o Test all printers/copiers to ensure they can print documents sent across the network.
The COO has determined the following rules to facilitate occupancy:
• IT Area must be ready first. Deploy and test network servers and desktop PC three weeks before any
other location.
• Administrative Areas must be ready second. Deploy and test their desktop PCs and VOIP phones one
week before remaining locations.
• Conference & Meeting Rooms must be ready third. Deploy and test their desktop PCs, VOIP
phones and wireless projectors five days before the remaining locations.
• Offices and labs are last. Deploy and test their desktop PCs, VOIP phones and wireless projectors
before occupancy.
Project Details: The new building includes the IT Area, Computer Labs, Administrative Areas, Individual
Offices, a Conference Room, and a Public Meeting Room.
IT Area: resources include
• 4 network servers
• 1 desktop PC
• 2 laptops
• 2 VOIP phones Administrative Areas: 2 administrative areas will each have
• 4 workstations, each with a desktop PC, networked via a network port
• a VOIP phone for each of the 4 workstations
• a vendor-supplied networked copier
Conference Room. The conference room has
• a wireless ceiling-mounted Projector
• network connectivity via a network cable and a wireless access point
• a VOIP phone
Meeting Room. The meeting room has
• a wireless ceiling-mounted Projector
• 1 desktop PC with network connectivity via a network cable.
• 2 VOIP phones (one near the lectern and the other wall mounted at the entrance
Individual Offices: 40 offices will each have
• a desktop PC networked via a network port
• a VOIP phone
Computer Labs: 2 computer labs will each have
• a wireless ceiling-mounted Projector
• a desktop PC, networked via a network port, and directly cabled to the Projector
• 25 desktop PCs networked via a network port
• a VOIP phone
• a vendor-supplied networked copier
Personnel Assignments
PC Specialist (equipment purchase, software setup and PC support):
o purchase, setup and installation of new laptops and desktop computers and corporate software
o purchase of all projectors
o work with Network Specialist to ensure network access is available on all computers and
networked printers
Network Specialist (Telecomm support):
o setup and installation of network servers and all VOIP phones
o work with PC Specialist to ensure network access is available on all computers and networked
printers
AV Specialist (A/V requirements):
o Installation of all wireless projectors
o work with PC Specialist to ensure projectors can be accessed by appropriate computers
Take time to think about how the work of the Specialists will be conducted.
• Understand how the occupancy rules affect the schedule timeline.
o Since some locations are occupied at different times, handle the deployment and testing of
resources for each location separately (i.e. IT Area separate from Admin Area; Conference Room,
Meeting Room, etc.).
• Make sure you satisfy all project specifications.
• The PC Specialist, Network Specialist and AV Specialist can be completing tasks concurrently and it is quite
possible that one specialist will have to wait while another specialist completes a task.
• The schedule must include a milestone for each block of tasks (Purchase Resources, Setup Equipment,
Deploy and Test).
o Each resource (network servers, computers, projectors) must be purchased separately since
they will come from different vendors. The VOIP phones and third-party network printers are
already ordered and just need to be tested once they arrive.
o Note: a single task may be used for a resource that is tested at a specific time (i.e. the testing of
all computers for administrative areas can be a single task; or the testing of all computer for the
2 computer labs can be a single task). However, a single task cannot be used when an action
must be done during different occupancy periods (i.e., testing of IT Area resources is a separate
task from testing of Administrative Areas, etc. since they take occupancy at different times.)
• Task Actions must start with a verb and describe the action (i.e., Test VOIP phones)
o Milestones do not start with verbs and have a zero duration.
• When creating the schedule, use your best guess in determining Duration. Use a single measure (i.e.,
min.) for all tasks.
• Resources must include both the people (title of the IT Specialist) and specific resource(s).
• When creating Predecessors, point to the respective Task # (not the WBS number). It is not necessary
to include a task that is already a predecessor of another task (i.e. consider the following tasks: 1:
Order food, 2: Eat food, 3: Cleanup. The predecessor for 2 is 1. The predecessor for 3 is 2 (i.e. 2
already has a predecessor of 1).
o Note: be careful about predecessors. Not only are they directly related to the tasks that
proceed them within a Milestone but they may be directly related to tasks within other
Milestones (example: network servers must be operational before other equipment can be
tested for network connectivity – look for other dependencies described above).
• The WBS should be completed once the schedule is in its final version.
Collepals.com Plagiarism Free Papers
Are you looking for custom essay writing service or even dissertation writing services? Just request for our write my paper service, and we'll match you with the best essay writer in your subject! With an exceptional team of professional academic experts in a wide range of subjects, we can guarantee you an unrivaled quality of custom-written papers.
Get ZERO PLAGIARISM, HUMAN WRITTEN ESSAYS
Why Hire Collepals.com writers to do your paper?
Quality- We are experienced and have access to ample research materials.
We write plagiarism Free Content
Confidential- We never share or sell your personal information to third parties.
Support-Chat with us today! We are always waiting to answer all your questions.