Define PM assessment in context of the PMO infrastructure management.
Need help with this assignment?Get an original answer from a qualified tutor — from $10/page.
Get it written →
Common Assignment Requirements
Project management (PM) assessment and project auditing enable the project management office (PMO) infrastructure management and technical support. The purpose of this assignment is for you to understand and synthesize the application of PM assessment as an enabling infrastructure for PMO sustainable success.
For this assignment, address the following items:
- –In your own words including scholarly reference support,
- —Define PM assessment in context of the PMO infrastructure management.
- —Describe the primary domains encompassing PMO assessment.
- –In your own words including scholarly reference support,
- —Define project auditing context of the PMO technical support.
- —Describe the main functions encompassing PMO project auditing.
- –Explain the distinction between PMO assessment and auditing.
- –Based on the
(2013) case study, identify how PMO assessment and auditing played a role in the firm’s successful growth. Include specific assignment tools and/or techniques used to measure effectiveness. - –Summarize how the PM assessment improves PMO success and business results while recognizing ethical considerations and challenges unique to an international PMO.
Reference:
Project Management Institute. (2013). TD Bank N.A.s enterprise-wide PMO monitors projects and maintains focus on strategic goals.
PMO Assessment for Advancement Essay
For the assignment Option #1, write an essay to address the Module 5 Common Assignment Requirements.
Submit your Critical Thinking assignment as a single Microsoft Word document to the submissions area established for this purpose.
Your essay should address the following requirements:
- Your well-written PMO recommendation essay thesis should be 7 pages in length, which does not include the title, reference, or appendix pages. You need to add headings subheadings associated with each of the bullet points listed in the common assignment requirements.
- Format your presentation according to APA guidelines Include title and reference pages.
- In addition to your course textbook and the assignment case study, cite at least three current (published within the past 5 years) scholarly resources (peer-reviewed, official governmental reports, and other scholarly sources) to support your suppositions, assertions, and conclusions.
- Include an appendix for tables and figures as appropriate.
Please write clearly, concisely, and cohesively; use section level headers to organize the key elements of your thesis.
- Chapters 6 & 15 in The Complete Project Management Office Handbook
- Part 1: Chapter sections 4.5 & 4.6; Part 2: Chapter 5 in
- Aubry, M., & Lavoie-Tremblay, M. (2018). . International Journal of Project Management, 36(1), 12-26. https://doi.org/10.1016/j.ijproman.2017.05.012
- Bredillet, C., Tywoniak, S., & Tootoonchy, M. (2018). . International Journal of Project Management, 36(5), 744-761. https://doi.org/10.1016/j.ijproman.2018.04.001
- Philbin, S. P., & Kaur, R. (2020). . Journal of Modern Project Management, 7(4), 122. https://doi.org/10.19255/JMPM02212
Hill, G. M. (2013). The complete project management office handbook (3rd ed.). CRC Press.
Kerzner, H. (2017). Project management: A systems approach to planning, scheduling, and controlling (12th ed.). John Wiley & Sons.
Project Management Institute. (2017). A guide to the project management body of knowledge (PMBOK Guide) (6th ed.). PMI Publications.
Project Management Institute. (2018). The standard for organizational project management. PMI Publications, Inc.
Get a plagiarism-free answer to this question
Send us your instructions and we’ll match you with the best writer in your subject.
- 100% human-written, zero AI
- Turnitin report included
- Confidential — we never share your data
- Free revisions & refunds