STEP ACTION COMMENTS 1 Fill the Water Seal Chamber to 2cm H2O Hold funnel down and fill to top.
Need help with this assignment?Get an original answer from a qualified tutor — from $10/page.
Get it written →STEP ACTION COMMENTS 1 Fill the Water Seal Chamber to 2cm H2O Hold funnel down and fill to top. Raise funnel to fill water seal to 2cm fill line. 2 Fill Suction Control Chamber to 20cm H2O (or desired pressure level) Remove vent plug, pour water to desired suction level. Replace vent plug. 3 Connect CDU to patient’s thoracic tube Connect chest drain to patient prior to initiating suction. 4 Attach wall suction tubing to anterior suction port on CDU Remove funnel and discard. Attach wall suction tubing to open end. Check to be sure that stopcock is in the OPEN position. 5 Position CDU at the correct level Place CDU in upright position below the patient’s chest level. 6 Reassess patient Reassess respiratory status, ensure drainage tubes are not kinked, and provide reassurance, answer questions, etc. 1. Number in the proper sequence for setting up a CDU: 1. A. Position CDU below the level of the patient 2. B. Fill the water seal chamber 3. C. Ensure that drainage tubes are not kinked 4. D. Pour sterile water into the suction control chamber 5 E. Connect patient to CDU 6. F. Attach suction line to suction port on top
Get a plagiarism-free answer to this question
Send us your instructions and we’ll match you with the best writer in your subject.
- 100% human-written, zero AI
- Turnitin report included
- Confidential — we never share your data
- Free revisions & refunds